CWA 50272:2021 - Methodology, procedures and equipment required for the laboratory testing of a modular and crosscutting Power Take-Off for wave energy converters
We will be carrying out essential maintenance work on BSI Shop between 08:00-14:00 BST on Sat 15th May 2021. During this time, BSI Shop will be unavailable or will have limited functionality. Please DO NOT place any orders whilst this work is taking place. Please accept our apologies for any inconvenience caused.

CWA 50272:2021

Methodology, procedures and equipment required for the laboratory testing of a modular and crosscutting Power Take-Off for wave energy converters

Status : Current   Published : April 2021

Format
HARDCOPY






Standard NumberCWA 50272:2021
TitleMethodology, procedures and equipment required for the laboratory testing of a modular and crosscutting Power Take-Off for wave energy converters
StatusCurrent
Publication Date09 April 2021
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
ICS27.140
PublisherCEN
FormatA4
DeliveryNo
Pages29
File Size8.599 MB
Price£170.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

Access, view and download standards with multiple user access, across multiple sites with BSOL


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Worldwide Standards
We can source any standard from anywhere in the world