21/30431284 DC - BS EN IEC 62783-1. Twinax cables for digital communications. Part 1. Generic specification

21/30431284 DC

BS EN IEC 62783-1. Twinax cables for digital communications. Part 1. Generic specification

Status : Draft for public comment, Current   Published : April 2021

Format
PDF

Format
HARDCOPY






Standard Number21/30431284 DC
TitleBS EN IEC 62783-1. Twinax cables for digital communications. Part 1. Generic specification
StatusDraft for public comment, Current
Publication Date30 April 2021
Normative References(Required to achieve compliance to this standard)IEC 60811-504, IEC 60811-401, IEC 60811-510, IEC TR 61156-1-2, IEC 62153-4-5, IEC 60304, IEC 60068-2-78, IEC 60332-1-2, IEC 62153-4-3, IEC 60068, IEC 60332-3-25, IEC 61156-1, IEC 60050-726, IEC 60332-3-24, IEC 60708, IEC 60794-1-2, IEC 60754-1, IEC 60754-2, IEC 60811-406, IEC 62153-4-9, IEC 60811-506, IEC 60189-1, IEC 60811-509, IEC 60811-501, IEC 60811-502, IEC 60811-508, IEC 61034, IEC 60028, IEC 60811-201, IEC TR 60344, IEC 60811-203, IEC 60332-2-2
Informative References(Provided for Information)IEC 62153-1-1, IEC TR 62152, ISO/IEC 11801-5
International RelationshipsIEC 62783-1 Ed.2.0
Draft Expiry Date23 June 2021
DescriptorsElectric wires, Mass, Gauges, Testing conditions, Designations, Diameter, Test specimens, Force, Axial, Mechanical testing, Crimping tools, Low frequencies, Endurance testing, Performance testing, Concentric, Dimensions, Radiofrequencies, Acceptance (approval), Design, Hand tools, Tensile strength, Electric cables
ICS25.140.30
33.120.20
CommitteeEPL/46
PublisherBSI
FormatA4
DeliveryYes
Pages20
File Size522 KB
NotesWarning: this draft is not current beyond its expiry date for comments.
Price£20.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


BSOL

Access, view and download standards with multiple user access, across multiple sites with BSOL


Develop a PAS

Develop a fast-track standardization document in 9-12 months