BS EN 50152-3-1:2017 - TC - Tracked Changes. Railway applications. Fixed installations. Particular requirements for a.c. switchgear. Measurement, control and protection devices for specific use in a.c. traction systems. Devices

BS EN 50152-3-1:2017 - TC

Tracked Changes. Railway applications. Fixed installations. Particular requirements for a.c. switchgear. Measurement, control and protection devices for specific use in a.c. traction systems. Devices

Status : Current   Published : February 2020

Format
PDF






Standard NumberBS EN 50152-3-1:2017 - TC
TitleTracked Changes. Railway applications. Fixed installations. Particular requirements for a.c. switchgear. Measurement, control and protection devices for specific use in a.c. traction systems. Devices
StatusCurrent
Publication Date26 February 2020
Normative References(Required to achieve compliance to this standard)IEC 61869-1:2007, EN 50152-3-3:2016, EN 61869-1:2009, IEC 60255-1, EN 50152-3-2:2016, EN 50163:2004, EN 60255-1, EN 50152-2:2012, EN 61869, EN 50124-1, IEC 61869, EN 61243-5, EN 50121-5, IEC 61243-5
Informative References(Provided for Information)EN 50388, IEC 60050, IEC 60870-2-1, EN 60688, EN 50152-1, IEC 60255, EN 60255, IEC 60688, EN 60870-2-1, EN 50633, IEC/TS 60815
DescriptorsRailway fixed equipment, Electrical protection equipment, Electric control equipment, Electrical measurement, Alternating current, Electric power transmission, Switchgear, Circuit-breakers, Control devices, Voltage, Design, Electrical measuring instruments, Railway equipment, Railway electric traction equipment, Electric power systems, Alternating-current power transmission, Electrical safety
ICS29.130.20
29.280
CommitteeGEL/9/3
ISBN978 0 539 10698 5
PublisherBSI
FormatA4
DeliveryYes
Pages51
File Size3.012 MB
Price£236.60


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months