19/30400095 DC - BS EN 17443. Winter service equipment. Brine production systems. Requirements and test methods

19/30400095 DC

BS EN 17443. Winter service equipment. Brine production systems. Requirements and test methods

Status : Current, Draft for public comment   Published : December 2019

Format
PDF

Format
HARDCOPY



This document specifies the essential requirements of stationary systems for production of brines for winter road maintenance and includes tests of these requirements. Installation boundary: chloride and water inlet to the saturator, brine outlet to the spreading machine. Within the scope are brine storage and brine loading/unloading equipment also.

The following points are not covered by this document:

  • System and construction requirements;

  • Requirements according national and European legislations.




Standard Number19/30400095 DC
TitleBS EN 17443. Winter service equipment. Brine production systems. Requirements and test methods
StatusCurrent, Draft for public comment
Publication Date09 December 2019
Normative References(Required to achieve compliance to this standard)EN 16811-1, EN 15144, ISO 2479, EN 16811-2
Informative References(Provided for Information)EN 15597-1, CEN/TS 16811-3, ISO 649-2, EN 15597-2
International RelationshipsprEN 17443
Draft Expiry Date28 January 2020
DescriptorsMaintenance, Roads, Winter, Test methods, Production, Brine
ICS13.030.40
Title in FrenchMatériels de viabilité hivernal Unités de fabrication de saumures Exigences et méthodes d'essais
Title in GermanWinterdienstausrüstung - Soleerzeugungsanlagen - Anforderungen und Prüfmethoden
CommitteeB/513
PublisherBSI
FormatA4
DeliveryYes
Pages22
File Size461 KB
NotesWarning: this draft is not current beyond its expiry date for comments.
Price£20.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months