19/30391672 DC - BS EN 60947-9-2. Low-voltage switchgear and controlgear. Active arc-fault mitigation systems. Part 9-2. Optical-based internal arc-detection and mitigation devices

19/30391672 DC

BS EN 60947-9-2. Low-voltage switchgear and controlgear. Active arc-fault mitigation systems. Part 9-2. Optical-based internal arc-detection and mitigation devices

Status : Current, Draft for public comment   Published : February 2019

Format
PDF

Format
HARDCOPY






Standard Number19/30391672 DC
TitleBS EN 60947-9-2. Low-voltage switchgear and controlgear. Active arc-fault mitigation systems. Part 9-2. Optical-based internal arc-detection and mitigation devices
StatusCurrent, Draft for public comment
Publication Date15 February 2019
Normative References(Required to achieve compliance to this standard)IEC 61439-2:2011, IEC 60947-1:2007, IEC 61482-1-2:2014, IEC 61439-1:2011, IEC 60947-9-1:2019, IEC 60364-4-44:2007, IEC 60664-1:2007, IEC 60068-2-6:2007, IEC 60947-2:2016, IEC 60068-2-30:2005, IEC 60068-2-27:2008, ISO 3864-1:2011, IEC 60947-1:2007/AMD1:2010, ISO 3864-2:2016, IEC TR 61641:2014, IEC 61439 (series), IEC 61557-2:2007, IEC 60947-1:2007/AMD2:2014
Informative References(Provided for Information)JIS C 1609-1:2006, IEC 61439-2, CISPR 11, IEC TR 63201, IEC 60269 (all parts), IEC TS 63208, CNS 5119:1988, IEEE 1584, CSA Z462, IEC 60079 (all parts), NFPA 70E, DIN 5032, IEC 62606, IEC TR 61439-0, IEC TS 63107, CISPR 32, IEC 61439-2:2011, EN 12464-1:2011
International RelationshipsIEC 60947-9-2 Ed.1.0
Draft Expiry Date03 April 2019
DescriptorsArcs (electric), Control gear (electric), Low voltage, Electrical equipment, Switchgear
ICS29.130.20
CommitteePEL/121/1
PublisherBSI
FormatA4
DeliveryYes
Pages73
File Size1.715 MB
NotesWarning: this draft is not current beyond its expiry date for comments.
Price£20.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


Develop a PAS

Develop a fast-track standardization document in 9-12 months


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version