BS EN 62586-2:2017 - Power quality measurement in power supply systems. Functional tests and uncertainty requirements

BS EN 62586-2:2017

Power quality measurement in power supply systems. Functional tests and uncertainty requirements

Status : Current, Work in hand   Published : November 2017

Format
PDF

Format
HARDCOPY






Standard NumberBS EN 62586-2:2017
TitlePower quality measurement in power supply systems. Functional tests and uncertainty requirements
StatusCurrent, Work in hand
Publication Date21 November 2017
Normative References(Required to achieve compliance to this standard)EN 61000-4-15 (IEC 61000-4-15:1997 AS), EN 61000-4-30:2015, EN 62586-1:2014, EN 61000-2-4 (IEC 61000-2-4:2002) AS, IEC 61000-4-30:2015, IEC 61000-4-7:2002, IEC 61000-2-4:2002, IEC 61000-4-15:2010, ISO/IEC Guide 23:1982, IEC 62586-1:2013, EN 61000-4-7:2002
Informative References(Provided for Information)IEC 61000-4-30:2008, EN 61000-4-30:2009 (IEC 61000-4-30), IEC 60359:2001, EN 60359:2002
ReplacesBS EN 62586-2:2014
International RelationshipsIEC 62586-2:2017/COR1:2018,EN 62586-2:2017/AC:2018-09
Amended ByCorrigendum, September 2018; Corrigendum, July 2018
DescriptorsElectrical engineering, Electrical measuring instruments, Performance, Electrical measurement, Electronic engineering
ICS17.220.20
Title in FrenchMesure de la qualité de l'alimentation dans les réseaux d'alimentation Essais fonctionnels et exigences d'incertitude
Title in GermanMessung der Spannungsqualität in Energieversorgungssystemen Funktionsprüfungen und Anforderungen an die Messunsicherheit
CommitteePEL/85
ISBN978 0 539 02341 1
PublisherBSI
FormatA4
DeliveryYes
Pages146
File Size3.153 MB
Price£336.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

Access, view and download standards with multiple user access, across multiple sites with BSOL


Worldwide Standards
We can source any standard from anywhere in the world


Develop a PAS

Develop a fast-track standardization document in 9-12 months