BS EN IEC 61968-5:2020 - Application integration at electric utilities. System interfaces for distribution management. Distributed energy optimization

BS EN IEC 61968-5:2020

Application integration at electric utilities. System interfaces for distribution management. Distributed energy optimization

Status : Current   Published : September 2020

Format
PDF

Format
HARDCOPY



IEC 61968-5:2020 is the description of a set of functions that are needed for enterprise integration of DERMS functions. These exchanges are most likely between a DERMS and a DMS. However, since this is an enterprise integration standard which may leverage IEC 61968-100:2013 for application integration (using web services or JMS) or other loosely-coupled implementations, there are no technical limitations for systems with which a DERMS might exchange information. Also, it should be noted that a DERMS might communicate with individual DER using a variety of standards and protocols such as IEC 61850, IEEE 2030.5, Distribution Network Protocol (DNP), Sunspec Modbus, or perhaps Open Field Message Bus (OpenFMB). One role of the DERMS is to manage this disparity and complexity of communications on the behalf of the system operator. However, the communication to individual DER is out of scope of this standard. Readers should look to those standards to understand communication to individual DER’s smart inverter.


The scope will be limited to the following use case categories:


• DER group creation – a mechanism to manage DER in aggregate


• DER group maintenance – a mechanism to add, remove, or modify the members and/or aggregated capabilities of a given group of DER


• DER group deletion – removing an entire group


• DER group status monitoring – a mechanism for quantifying or ascertaining the current capabilities and/or status of a group of DER


• DER group forecast – a mechanism for predicting the capabilities and/or status of a group of DER for a given time period in the future


• DER group dispatch – a mechanism for requesting that specified capabilities of a group of DER be dispatched to the grid


• DER group voltage ramp rate control – a mechanism for requesting that a DER group following a ramp rate curve


• DER group connect/disconnect – a mechanism to request that DER either isolate themselves, or reconnect to the grid as needed.




Standard NumberBS EN IEC 61968-5:2020
TitleApplication integration at electric utilities. System interfaces for distribution management. Distributed energy optimization
StatusCurrent
Publication Date30 September 2020
Normative References(Required to achieve compliance to this standard)IEC/TR 62051, IEC 60050-300, IEC TR 62051, IEC/TR 62357-1:2016, IEC 62055-31, IEC 61968-9:2013, IEC TS 61968-2, EN 62055-31, IEC/TS 61968-2, EN 61968-11, IEEE 1547:2018, IEC 61968-11, IEC 61968-100:2013, EN 61968-100:2013, EN 61968-9:2014, IEC TR 62357-1:2016
Informative References(Provided for Information)No other standards are informatively referenced
International RelationshipsEN IEC 61968-5:2020,IEC 61968-5:2020
Draft Superseded By18/30371598 DC
DescriptorsElectric utilities, Interfaces, Management, Electric power distribution, Electric power systems, Energy distribution
ICS33.200
Title in FrenchIntégration d'applications pour les services électriques. Interfaces système pour la gestion de distribution Optimisation de l'énergie distribuée
Title in GermanIntegration von Anwendungen in Anlagen der Elektrizitätsversorgung. Systemschnittstellen für Netzführung Optimierung dezentraler Energie
CommitteePEL/57
ISBN978 0 580 99555 2
PublisherBSI
FormatA4
DeliveryYes
Pages56
File Size2.816 MB
Price£260.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


BSOL

Access, view and download standards with multiple user access, across multiple sites with BSOL


Develop a PAS

Develop a fast-track standardization document in 9-12 months