ASTM E2691 - 16 - Standard Practice for Job Productivity Measurement

Related Standards

ASTM E2691 - 16

Standard Practice for Job Productivity Measurement

Status : Current   Published : March 2016

Format
PDF

Format
HARDCOPY



1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.

1.2 JPM measures labor productivity of the installation processes on a construction job. 2

1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.

1.4 JPM takes into account the difficulty of installation at any given point on a job.

1.5 JPM evaluates relative productivity changes using trend monitoring.




Standard NumberASTM E2691 - 16
TitleStandard Practice for Job Productivity Measurement
StatusCurrent
Publication Date01 March 2016
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
Descriptors Accounting Agile Agile construction Construction accounting Construction production Construction productivity measure Construction put in place Cost codes CPIP Effectiveness Efficiency Individual productivity Job labor variance Job layout Job productivity Job productivity assurance and control Job productivity measurement Job tracking JPAC JPM Labor productivity Labor variation Lean Lean construction Low cost provider Observed percent complete Planning Predicting profits Predictions Process of project management Production Productivity Productivity measurement Profitability Six Sigma in construction SPC SPC in construction Statistical process control System productivity Trends Trend monitoring Value engineering Variation Variation measurement in construction Work breakdown structure
ICS03.100.30
PublisherASTM
FormatA4
DeliveryYes
Pages25
File Size1.165 MB
Price£58.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Collaborate, Innovate, Accelerate.


Worldwide Standards
We can source any standard from anywhere in the world


BSOL

The faster, easier way to work with standards