ASTM C1411 - 14 - Standard Practice for The Ion Exchange Separation of Uranium and Plutonium Prior to Isotopic Analysis

ASTM C1411 - 14

Standard Practice for The Ion Exchange Separation of Uranium and Plutonium Prior to Isotopic Analysis

Status : Current   Published : January 2014

Format
PDF

Format
HARDCOPY



1.1 This practice is for the ion exchange separation of uranium and plutonium from each other and from other impurities for subsequent isotopic analysis by thermal ionization mass spectrometry. Plutonium–238 and uranium–238, and plutonium–241 and americium–241, will appear as the same mass peak and must be chemically separated prior to analysis. Only high purity solutions can be analyzed reliably using thermal ionization mass spectrometry.

1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.

1.3  This standard may involve hazardous material, operations, and equipment. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to consult and establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.




Standard NumberASTM C1411 - 14
TitleStandard Practice for The Ion Exchange Separation of Uranium and Plutonium Prior to Isotopic Analysis
StatusCurrent
Publication Date01 January 2014
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
Descriptors Ion exchange, Mass spectrometry, Plutonium, Plutonium isotopic analysis, Thermal ionization mass spectrometry, Uranium, Uranium isotopic analysis
ICS27.120.30
PublisherASTM
FormatA4
DeliveryYes
Pages4
File Size0 KB
Price£36.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


Develop a PAS

Develop a fast-track standardization document in 9-12 months


BSOL

The faster, easier way to work with standards