PD IEC/TS 62561-8:2018 - Lightning protection system components (LPSC). Requirements for components for isolated LPS

PD IEC/TS 62561-8:2018

Lightning protection system components (LPSC). Requirements for components for isolated LPS

Status : Current   Published : February 2018

Format
PDF

Format
HARDCOPY



This document specifies the requirements and tests for insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance, and the requirements and tests for insulating down-conductors, including their specific fasteners, able to reduce the separation distance.

Testing of insulating stand-offs and insulating down-conductors components for an explosive atmosphere is not covered by this document.

Requirements and tests for other types of components for isolated LPS are under consideration.




Standard NumberPD IEC/TS 62561-8:2018
TitleLightning protection system components (LPSC). Requirements for components for isolated LPS
StatusCurrent
Publication Date09 February 2018
Normative References(Required to achieve compliance to this standard)ISO 4892-4, IEC 62305-3, IEC 61083-1, IEC 61083-2, ISO 4892-2, IEC 62561-4, IEC 60068-2-75:2014, ISO 6988:1985 (R11), IEC 62561-2:2012, ISO 4892-3:2016, IEC 62561-1:2017, ISO 6957:1988, IEC 60068-2-52:2017, IEC 60060-2:2010
Informative References(Provided for Information)IEC 60332-3, IEC 61034, IEC 62305-1:2010, IEC 60060-1:2010
International RelationshipsIEC TS 62561-8:2018
DescriptorsElectrical protection equipment, Climatic protection, Earth electrodes, Electrical components, Lightning protection, Watertightness tests, Lightning conductors, Electrical connections, Loading, Enclosures, Seals, Access
ICS29.020
91.120.40
CommitteeGEL/81
ISBN978 0 580 85981 6
PublisherBSI
FormatA4
DeliveryYes
Pages56
File Size1.327 MB
Price£254.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months


BSOL

The faster, easier way to work with standards