BS EN 50518-1:2013 - Monitoring and alarm receiving centre. Location and construction requirements

Find Similar Items

This product falls into the following categories.

You may find similar items within these categories by selecting from the choices below:

BS EN 50518-1:2013

Monitoring and alarm receiving centre. Location and construction requirements

Status : Withdrawn   Published : September 2014 Replaced By : BS EN 50518:2019

WITHDRAWN TITLE
*To ask about withdrawn titles contact the
BSI Customer Services
cservices@bsigroup.com, +44 345 086 9001


This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site. This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.




Standard NumberBS EN 50518-1:2013
TitleMonitoring and alarm receiving centre. Location and construction requirements
StatusWithdrawn
Publication Date30 September 2014
Withdrawn Date22 August 2019
Cross ReferencesEN 54, EN 179, EN 356, EN 1063, EN 1303, EN 1522, EN 1627, EN 1906, EN 12209, EN 13501-2, EN 13779, EN 14846, EN 50131-1, EN 50131-4, EN 50132-7, EN 50136-1, EN 50272-2, EN 50518-2, EN 50518-3, EN 62040-1, IEC 62040-1, EN 62305, IEC 62305, CEN/TR 14383-8, CLC/TS 50131-7, EN 1154:1996+A1:2002, EN 50131, EN 50132, EN 50133, EN 50134, EN 50136, EN 61000-4-2, IEC 61000-4-2
Replaced ByBS EN 50518:2019
ReplacesBS EN 50518-1:2010, BS 5979:2007
International RelationshipsEN 50518-1:2013
DescriptorsSecurity systems in buildings, Electric power systems, Alarm systems, Crime prevention devices, Anti-burglar measures, Burglar alarms, Signals, Business facilities, Warning devices, Remote control systems, Locks, Call centres, Buildings
ICS13.320
Title in FrenchCentre de contrôle et de réception d’alarme. Exigences pour l’emplacement et la construction
Title in GermanAlarmempfangsstelle (AES). Örtliche und bauliche Anforderungen
CommitteeGW/1/11
ISBN978 0 580 82323 7
PublisherBSI
FormatA4
DeliveryYes
Pages26
File Size366 KB
Price£176.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
BSI Customer Services
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Collaborate, Innovate, Accelerate.


Worldwide Standards
We can source any standard from anywhere in the world


Customers who bought this product also bought

  • BS EN 50518-2:2013
    Monitoring and alarm receiving centre Technical requirements
  • BS EN 50518-3:2013
    Monitoring and alarm receiving centre Procedures and requirements for operation
  • BS 8591:2014
    Remote centres receiving signals from alarm systems. Code of practice
  • BS 7858:2012
    Security screening of individuals employed in a security environment. Code of practice