PD IEC/TR 62343-6-6:2011 - Dynamic modules. Failure mode effect analysis for optical units of dynamic modules

PD IEC/TR 62343-6-6:2011

Dynamic modules. Failure mode effect analysis for optical units of dynamic modules

Status : Revised, Superseded, Withdrawn   Published : February 2011 Replaced By : PD IEC/TR 62343-6-6:2017

WITHDRAWN TITLE
*To ask about withdrawn titles contact the
BSI Customer Services
cservices@bsigroup.com, +44 345 086 9001


IEC/TR 62343-6-6:2011(E) describes failure mode effect analysis (FMEA) for optical units of dynamic modules. FMEA is one of the effective and useful analysis methods to determine the reliability evaluation test items and conditions which are defined in future reliability qualification documents.




Standard NumberPD IEC/TR 62343-6-6:2011
TitleDynamic modules. Failure mode effect analysis for optical units of dynamic modules
StatusRevised, Superseded, Withdrawn
Publication Date28 February 2011
Withdrawn Date28 February 2017
Normative References(Required to achieve compliance to this standard)IEC 62005-3, IEC 61300-2-4, IEC 61300-2-9, IEC 61300-2-44, IEC 61300-2-19, IEC 61300-2-22, IEC 61300-2-17, IEC 61300-2-1, IEC 61300-2-18, IEC 61300-2-9:2017
Informative References(Provided for Information)IEC 61188, IEC 61192, IEC 61300-2, IEC 61189, IEC 61190, IEC 61291-5-2, IEC 61191
Replaced ByPD IEC/TR 62343-6-6:2017
International RelationshipsIEC TR 62343-6-6:2011
DescriptorsOptical communication systems, Test methods, Fibre optics, Analysis, Reliability, Degradation, Electronic equipment and components, Optical fibres
ICS33.180.20
CommitteeGEL/86/3
ISBN978 0 580 70315 7
PublisherBSI
FormatA4
DeliveryNo
Pages30
File Size1.198 MB
Price£182.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
BSI Customer Services
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months


BSOL

The faster, easier way to work with standards