BS EN 60546-1:2010 - Controllers with analogue signals for use in industrial-process control systems. Methods of evaluating the performance – BSI British Standards

BS EN 60546-1:2010

Controllers with analogue signals for use in industrial-process control systems. Methods of evaluating the performance

Status : Current   Published : February 2011

Format
PDF

Format
HARDCOPY



BS EN 60546-1:2010 Controllers with analogue signals for use in industrial-process control systems. Methods of evaluating the performance

BS EN 60546-1 is an International Standard which applies to proportional-integral-derivative (PID) pneumatic and electric industrial-process controllers using analogue continuous input and output signals which are in accordance with current international standards.

It should be noted that while the tests specified herein cover controllers having such signals, they can be applied in principle to controllers having different but continuous signals. It should be also noted that this standard has been written for pneumatic and electric industrial-process controllers with only analogue components and is not necessarily to be used for controllers with microprocessors.

This standard is intended to specify uniform methods of test for evaluating the performance of industrial-process PID controllers with analogue input and output signals.

The test conditions specified in this standard, for example the range of ambient temperatures, power supply, etc., are used when no other values are agreed upon by the manufacturer and the user.

Contents of BS EN 60546-1:

Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Basic relationships
5 General test conditions
6 Offset
7 Dial markings and scale values
8 Effect of influence quantities
9 Output characteristics and power consumption
10 Frequency response
11 Miscellaneous tests
12 Documentary information
13 Technical examination
14 Test report
15 Summary of tests
Bibliography




Standard NumberBS EN 60546-1:2010
TitleControllers with analogue signals for use in industrial-process control systems. Methods of evaluating the performance
StatusCurrent
Publication Date28 February 2011
Normative References(Required to achieve compliance to this standard)IEC 61298-1, IEC 61000-4-3, IEC 60068-2-6, EN 61000-4-3, EN 61298-3, IEC 61000-4-2, IEC 61298-3, EN 61010-1, IEC 61298-4, EN 60068-2-31, EN 60068-2-30, EN 60068-2-6, EN 61298-1, IEC 61010-1, EN 61298-4, EN 61000-4-2, IEC 60068-2-30, IEC 60068-2-31
Informative References(Provided for Information)IEC 60546-2, EN 60546-2, IEC 60027-2:2005, IEC 60382, IEC 60050-351:2006, EN 60027-2:007, EN 60382, IEC 60381
ReplacesBS EN 60546-1:1993
International RelationshipsEN 60061-4:1992/A9:2005,EN 60546-1:2010,IEC 60546-1:2010
Draft Superseded By08/30178660 DC
DescriptorsControl signals, Flow measurement, Electric control equipment, Automatic control systems, Circuits, Pneumatic control equipment, Controllers, Instrument scales, Performance testing, Air, Test equipment, Accelerated testing, Verification, Test atmospheres, Process control, Environmental testing, Control equipment, Analogue signals, Industrial, Frequency response, Drop tests, Noise (spurious signals), Control systems, Electrical testing, Testing conditions, Calibration, Electric power system disturbances
ICS25.040.40
Title in FrenchRégulateurs à signaux analogiques utilisés pour les systèmes de conduite des processus industriels. Méthodes d'évaluation des performances
Title in GermanRegler mit analogen Signalen für die Anwendung in Systemen der industriellen Prozesstechnik. Methoden zur Beurteilung des Betriebsverhaltens
CommitteeGEL/65/2
ISBN978 0 580 62203 8
PublisherBSI
FormatA4
DeliveryYes
Pages42
File Size690 KB
Price£214.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Worldwide Standards
We can source any standard from anywhere in the world


Develop a PAS

Develop a fast-track standardization document in 9-12 months