BS IEC 60748-23-3:2002 - Semiconductor devices. Integrated circuits. Hybrid integrated circuits and film structures. Manufacturing line certification. Manufacturers' self-audit checklist and report

BS IEC 60748-23-3:2002

Semiconductor devices. Integrated circuits. Hybrid integrated circuits and film structures. Manufacturing line certification. Manufacturers' self-audit checklist and report

Status : Current   Published : June 2002

Format
PDF

Format
HARDCOPY



Applies to a high quality approval system for hybrid integrated circuits and film structures.This checklist is intended for the use of a hybrid microcircuit manufacturer's internal assessment team. It will provide the hybrid manufacturer and the National Supervising Inspectorate with ongoing information on process control demonstrating compliance with IEC 60748-23-1.




Standard NumberBS IEC 60748-23-3:2002
TitleSemiconductor devices. Integrated circuits. Hybrid integrated circuits and film structures. Manufacturing line certification. Manufacturers' self-audit checklist and report
StatusCurrent
Publication Date18 June 2002
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
International RelationshipsIEC 60748-23-3:2002
Draft Superseded By94/216400 DC
DescriptorsElectrical equipment, Integrated circuits, Hybrid integrated circuits, Specification (approval), Semiconductor devices, Electrical components, Electronic equipment and components, Integrated film circuits, Acceptance (approval)
ICS31.200
Title in FrenchDispositifs a semiconducteurs. Circuits integres. Circuits integres hybrides et structures par films. Certification de la ligne de fabrication. Liste de controle et rapport d'evaluation interne pour fabricants
CommitteeEPL/47
ISBN0 580 39834 X
PublisherBSI
FormatA4
DeliveryYes
Pages88
File Size850 KB
Price£274.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Worldwide Standards
We can source any standard from anywhere in the world


Develop a PAS

Develop a fast-track standardization document in 9-12 months