BS EN 61943:1999, IEC 61943:1999 QC 211001:1999 - Integrated circuits. Manufacturing line approval application guideline

BS EN 61943:1999, IEC 61943:1999 QC 211001:1999

Integrated circuits. Manufacturing line approval application guideline

Status : Current   Published : December 1999

Format
PDF

Format
HARDCOPY



How to apply the principles and requirements given in IEC 61739 to manufacturers of monolithic integrated circuits applying for manufacturing line approval.




Standard NumberBS EN 61943:1999, IEC 61943:1999 QC 211001:1999
TitleIntegrated circuits. Manufacturing line approval application guideline
StatusCurrent
Publication Date15 December 1999
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
International RelationshipsEN 61943 (IEC 61943:1999 Adopt
Draft Superseded By96/201666 DC
DescriptorsComputer software, Quality assurance, Interfaces (data processing), Computer-aided design, Integrated circuits, Production management, Design, Product design, Conformity, Quality control, Verification, Packaging, Identification methods, Production processes, Approval testing, Failure (quality control), Statistical quality control, Performance testing, Assembling, Classification systems, Certification (approval)
ICS31.200
Title in FrenchCircuits integres. Guide d'application pour l'agrement des lignes de fabrication
Title in GermanIntegrierte Schaltkreise Anwendungsleitfaden fuer die Anerkennung von Fertigungslinien
CommitteeEPL/47
ISBN0 580 35077 0
PublisherBSI
FormatA4
DeliveryYes
Pages28
File Size1.771 MB
Price£182.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Worldwide Standards
We can source any standard from anywhere in the world


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version