BS EN 45510-4-3:1999 - Guide for the procurement of power station equipment. Boiler auxiliaries. Draught plant. Draught plant

BS EN 45510-4-3:1999

Guide for the procurement of power station equipment. Boiler auxiliaries. Draught plant. Draught plant

Status : Current, Under review   Published : September 1999

Format
PDF

Format
HARDCOPY






Standard NumberBS EN 45510-4-3:1999
TitleGuide for the procurement of power station equipment. Boiler auxiliaries. Draught plant. Draught plant
StatusCurrent, Under review
Publication Date15 September 1999
Confirm Date01 January 2005
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
International RelationshipsEN 45510-4-3:1999
DescriptorsElectric terminals, Project management, Regulations, Ducted fans, Access, Tendering, Technical documents, Steam-electric power stations, Boilers, Ducting, Approval testing, Contracts, Quality assurance, Exhausters, Legislation, Performance, Purchasing, Maintenance, Corrosion protection, Conformity, Steam plant, Environment (working), Selection, Extraction fans, Noise (environmental), Life (durability), Stability, Specifications, Vibration, Electric power stations, Design, Dampers (air conditioning), Performance testing, Technical writing
ICS27.060.30
27.100
Title in FrenchGuide pour l'acquisition d'equipements destines aux centrales de production d'electricite. Auxiliaires de chaudiere. Systeme de ventilation
Title in GermanLeitfaden fuer die Beschaffung von Ausruestungen fuer Kraftwerke. Nebenanlagen. Ventilatoranlage
CommitteeE/-/20
ISBN0 580 32506 7
PublisherBSI
FormatA4
DeliveryYes
Pages20
File Size227 KB
Price£130.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months