BS EN 60255-3:1998 - Electrical relays. Single input energizing quantity measuring relays with dependent or independent time

BS EN 60255-3:1998

Electrical relays. Single input energizing quantity measuring relays with dependent or independent time

Status : Superseded, Withdrawn   Published : November 1998 Replaced By : BS EN 60255-151:2009, BS EN 60255-127:2014

WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001


These relays have their operating time dependent or independent of the input energizing quantity. Thermal electrical relays are excluded.




Standard NumberBS EN 60255-3:1998
TitleElectrical relays. Single input energizing quantity measuring relays with dependent or independent time
StatusSuperseded, Withdrawn
Publication Date15 November 1998
Withdrawn Date28 February 2014
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
Replaced ByBS EN 60255-151:2009, BS EN 60255-127:2014
International RelationshipsEN 60255-3:1998
DescriptorsRelays, Switches, Switchgear, Measuring relays, Electrical protection equipment, Performance, Performance testing, Electrical testing, Testing conditions, Ratings, Accuracy, Error analysis, Graphical methods, Overvoltage, Tolerances (measurement), Time
ICS29.120.70
Title in FrenchRelais electriques. Relais de mesure et dispositifs de protection a une seule grandeur d'alimentation d'entree a temps dependant ou independant
Title in GermanElektrische Relais. Messrelais mit einer Eingangsgroesse mit abhaengiger oder unabhaengiger Zeitkennlinie
CommitteePEL/95
ISBN0 580 30467 1
PublisherBSI
FormatA4
DeliveryNo
Pages14
File Size1.033 MB
Price£110.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

The faster, easier way to work with standards


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months