BS EN 50187:1997 - Gas-filled compartments for a.c. switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
Essential maintenance work will be carried out on BSI Shop over the weekend of 12 and 13 June 2021. BSI Shop will be operational during this time but you might experience slowness for a very brief period of time. Please accept our apologies for any inconvenience this may cause.

BS EN 50187:1997

Gas-filled compartments for a.c. switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

Status : Current   Published : March 1997

Format
PDF

Format
HARDCOPY



Specifies materials, design, marking, inspection and testing for compartments pressurised up to 3 bar (gauge) with maximum PV of 2000 bar litres filled with inert gas.




Standard NumberBS EN 50187:1997
TitleGas-filled compartments for a.c. switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
StatusCurrent
Publication Date15 March 1997
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
International RelationshipsEN 50187:1996
Draft Superseded By93/205510 DC
DescriptorsSwitchgear, Electric control equipment, Gas-filled sealed-type transformers, Bus-bars, Gas-filled switching tubes, Electric enclosures, High-voltage equipment, Electrical equipment, Rated voltage, Design, Mathematical calculations, Safety devices, Safety valves, Marking, Pressure testing, Certification (approval), Quality, Inspection
ICS29.130.10
Title in FrenchCompartiments sous pression de gaz pour appareillage à courant alternatif de tensions assignées supérieures à 1 kV et inférieures ou égales à 52 kV
Title in GermanGasgefuellte Schottraeume fuer Wechselstrom-Schaltgeraete und Schaltanlagen mit Nennspannungen ueber 1 kV bis einschliesslich 52 kV
CommitteePEL/17
ISBN0 580 26917 5
PublisherBSI
FormatA4
DeliveryYes
Pages14
File Size318.6 KB
Price£112.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


Develop a PAS

Develop a fast-track standardization document in 9-12 months


Worldwide Standards
We can source any standard from anywhere in the world