CP 312-2:1973 - Code of practice for plastics pipework (thermoplastics material). Unplasticized PVC pipework for the conveyance of liquids under pressure

CP 312-2:1973

Code of practice for plastics pipework (thermoplastics material). Unplasticized PVC pipework for the conveyance of liquids under pressure

Status : Withdrawn   Published : November 1973

WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001





Standard NumberCP 312-2:1973
TitleCode of practice for plastics pipework (thermoplastics material). Unplasticized PVC pipework for the conveyance of liquids under pressure
StatusWithdrawn
Publication Date30 November 1973
Withdrawn Date01 January 2009
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
Amended ByAMD 2337
Draft Superseded ByD64/14118 DC
DescriptorsPipework systems, Pipes, Pipe fittings, Pipe couplings, Unplasticized polyvinyl chloride, Polyvinyl chloride, Thermoplastic polymers, Plastics, Polymers, Pressure pipes, Liquids, Installation, Bending, Underground, Service pressure, Test pressure, Hydraulic tests, Pipe supports, Spaced, Joining processes
ICS23.040.20
91.140.60
Title in FrenchCode professionnel pour tuyauterie en plastique (materiau thermoplastique). Tuyauterie CPV non plastifiee pour le transport de liquides sous pression
Title in GermanKunststoffroehren (Thermoplastmaterial). Merkblatt. Hart-PVC-Roehren fuer die Befoerderung von Fluessigkeiten unter Druck
CommitteePRI/88
ISBN0 580 07996 1
PublisherBSI
FormatA4
DeliveryYes
Pages24
File Size603.9 KB
NotesThis standard has been withdrawn as it is no longer relevant
Price£130.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Tracked Changes

Understand the changes made to a standard with our new Tracked Changes version


BSOL

The faster, easier way to work with standards


Develop a PAS

Develop a fast-track standardization document in 9-12 months