BS 171-4:1978, IEC 60076-4:1976 - Power transformers. Specification for tappings and connections

BS 171-4:1978, IEC 60076-4:1976

Power transformers. Specification for tappings and connections

Status : Superseded, Withdrawn   Published : August 1978 Replaced By : BS EN 60076-1:1997

WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001


Requirements valid for all categories of voltage variation, additional requirements for particular types of voltage variation, connections of phase windings and phase displacement between windings.




Standard NumberBS 171-4:1978, IEC 60076-4:1976
TitlePower transformers. Specification for tappings and connections
StatusSuperseded, Withdrawn
Publication Date31 August 1978
Confirm Date15 July 1993
Withdrawn Date15 July 1998
Normative References(Required to achieve compliance to this standard)No other standards are normatively referenced
Informative References(Provided for Information)No other standards are informatively referenced
Replaced ByBS EN 60076-1:1997
ReplacesBS 171:1970
International RelationshipsIEC 60076-4:1976
Draft Superseded By77/21326 DC
DescriptorsPower transformers, Windings, Short-circuit current tests, Impedance measurement, Electric load, Temperature rise, Voltage fluctuations, Magnetic fields, Rated power, Phase (electric), Three-phase transformers, Single-phase transformers, Transformers, Tappings (electrical), Autotransformers
ICS29.180
Title in FrenchTransformateurs de puissance. Spécification des prises et connexions
Title in GermanLeistungswandler. Spezifikation fuer Anzapfstellen und Anschlussleitungen
CommitteePEL/14
ISBN0 580 10158 4
PublisherBSI
FormatA4
DeliveryNo
Pages20
File Size1.133 MB
Price£182.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


BSOL

The faster, easier way to work with standards


Develop a PAS

Develop a fast-track standardization document in 9-12 months