BS 1139-6:2014 Metal scaffolding. Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification

Find Similar Items

This product falls into the following categories.

You may find similar items within these categories by selecting from the choices below:

BS 1139-6:2014

Metal scaffolding. Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification

Status : Current, Under review   Published : December 2014

Format
PDF

Format
HARDCOPY



BS 1139-6:2014 Metal scaffolding. Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification

BS 1139-6:2014 specifies requirements for the structural design of prefabricated tower scaffolds utilizing components from mobile access and working towers specified in BS EN 1004 but in configurations that are outside of the scope of that standard.

These configurations include:

  • Prefabricated tower scaffolds outside the height limits of BS EN 1004
  • Towers with more than one working platform
  • Large deck tower scaffolds
  • Linked tower scaffolds
  • Cantilever tower scaffolds
  • Stepped tower scaffolds
  • Tower scaffolds used as a means of access
  • Towers built on base plates instead of castors

BS 1139-6:2014 applies to prefabricated tower scaffolds subject to windloads up to and including 0.1 kN/m2.

Contents for BS 1139-6:2014 includes:

  • Foreword
  • Scope
  • Normative references
  • Terms and definitions
  • General Requirements
  • Materials
  • Dimensions
  • Structural design
  • Verification
  • Markings
  • Information to be supplied with a prefabricated tower scaffold

Supersession

This part of BS 1139 supersedes BS 1139-6:2005, which is withdrawn.

Relationship to other standards

This part of BS 1139 should be read in conjunction with, and is complementaryto, BS EN 1004, Mobile access and working towers made of prefabricatedelements — Materials, dimensions, design loads, safety and performancerequirements.




Standard NumberBS 1139-6:2014
TitleMetal scaffolding. Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification
StatusCurrent, Under review
Publication Date31 December 2014
Cross ReferencesBS EN 74, BS EN 1004, BS EN 1298, BS EN 1999-1-1, BS EN 12811-2, BS 8539, BS EN 1991-1-4, Work at Height Regulations 2005, BS EN 1993-1-1, BS EN 1995-1-1
ReplacesBS 1139-6:2005
Draft Superseded By14/30286613 DC
DescriptorsTemporary structures, Scaffolding components, Mobile scaffolds, Prefabricated parts, Construction equipment, Tower scaffolds, Scaffolds, Prefabrication, Structural design
ICS91.220
CommitteeB/514/24
ISBN978 0 580 83646 6
PublisherBSI
FormatA4
DeliveryYes
Pages32
File Size3.188 MB
Price£206.00


 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


Worldwide Standards
We can source any standard from anywhere in the world


Get ISO 45001

BSI Essentials: All-in-one BSI online toolkit for BS ISO 45001


BSOL

The faster, easier way to work with standards


Customers who bought this product also bought

  • BS EN 1298:1996
    Mobile access and working towers. Rules and guidelines for the preparation of an instruction manual
  • BS EN 1004:2004
    Mobile access and working towers made of prefabricated elements. Materials, dimensions, design loads, safety and performance requirements
  • BS 8620:2016
    Low level work platform with one working platform with side protection for use by one person with a maximum working platform height no greater than 2.5 m. Specification