DD CLC/TS 50131-7:2008 Alarm systems. Intrusion and hold-up systems. Application guidelines

What is DD CLC/TS 50131-7?

DD CLC/TS 50131-7 is a draft for development (DD). It will provide you with advice relating to the design, installation, operation and maintenance of Intruder and Hold-up Alarm Systems (I&HAS). The purpose of this document is to ensure, as far as is practical, that I&HAS provide the required performance with a minimum of unwanted alarms.

The application guidelines in DD CLC/TS 50131-7 are set out in the logical order in which an I&HAS would normally be designed and installed. Each procedure is set out separately in the document but in practice some of the procedures may be carried out simultaneously.

What is in DD CLC/TS 50131-7?

DD CLC/TS 50131-7 is set out in seven main clauses:

i) Clause 7 – System design
This clause will help those responsible for designing I&HAS to design systems suitable for the premises to be supervised. The design of I&HAS will depend on many factors all of which will influence more or less the design of I&HAS. Consideration of these factors will result in a system design proposal for an I&HAS with the appropriate extent, security grade and environmental class.

ii) Clause 8 – Installation planning
This clause will help those responsible for installing I&HAS by highlighting issues which should be considered before starting the installation of I&HAS.

iii) Clause 9 – System installation
In this clause, guidance is given with regard to issues arising during the installation of I&HAS. This clause will help to ensure I&HAS is correctly installed as specified at the design stage.

iv) Clause 10 – Inspection, functional testing and commissioning
In this clause, guidance is given on issues arising after I&HAS has been installed. The clause is intended to ensure I&HAS has been installed as specified and also provides the level of performance intended at the design stage. Guidance is also provided on the proper commissioning and handing over of the system to the user. It also gives guidance to the documents, records and operating instructions which should be provided.

v) Clause 11 – Documentation and records
This clause describes the documentation which should be provided to the client on completion of I&HAS. The documents are intended to provide a history of modifications to I&HAS, based on the as-fitted document, prepared when I&HAS installation was completed.
The records are intended to chronicle any corrective action carried out following unwanted alarm conditions and details of any repairs or modifications to I&HAS. The record should also include details of temporary fault conditions.

vi) Clause 12 – Operation of I&HAS
This clause describes the responsibility of the client or user of I&HAS to properly maintain I&HAS and to ensure it is operated correctly.

vii) Clause 13 – Maintenance and repair of I&HAS
This clause describes how I&HAS should be maintained and repaired to ensure I&HAS continues to provide the level of performance intended at the design stage.

Who should use DD CLC/TS 50131-7?

DD CLC/TS 50131-7 is useful to anyone responsible for the design, installation planning, system installation, commissioning, operation and maintenance of I&HAS.

Do I need any other documents with DD CLC/TS 50131-7?

DD CLC/TS 50131-7 is relevant to all classes and grades of I&HAS of any size and
complexity. It should be used in conjunction with BS EN 50131-1:2006.

Does DD CLC/TS 50131-7 replace any other document I’m using?

This Draft for Development is the UK implementation of CLC/TS 50131-7:2008. It replaces DD CLC/TS 50131-7:2003 which is withdrawn.

The contents of DD CLC/TS 50131-7 include:

Introduction
1 Scope
2 Normative references
3 Definitions and abbreviations
3.1 Definitions
3.2 Abbreviations
4 Security grade of I&HAS
4.1 Security grading
5 Environmental classification
5.1 Environmental Class I – Indoor
5.2 Environmental Class II – Indoor – General
5.3 Environmental Class III – Outdoor – Sheltered or indoor extreme conditions
5.4 Environmental Class IV – Outdoor – General
6 General
6.1 Other components
6.2 Electrical safety
6.3 Unwanted alarms
6.4 Responsibility
6.5 Qualifications
6.6 Competence
6.7 Tools
6.8 Confidentiality
6.9 Consultation
6.10 Compatibility
7 System design
7.1 Location survey – Risk
7.2 Location survey – Other influences
7.3 System design proposal
8 Installation planning
8.1 General
9 System installation
9.1 Installation process
10 Inspection, functional testing and commissioning
10.1 Inspection
10.2 Functional testing
10.3 Commissioning
10.4 Handover
10.5 Test period
10.6 Acceptance
10.7 As-fitted document
10.8 Certificate of conformance
11 Documentation and records
11.1 Documentation
11.2 Records
12 Operation of I&HAS
13 Maintenance and repair of I&HAS
13.1 General
13.2 Inspection and servicing
13.3 Repair
Annexes
Bibliography

 




Standard NumberDD CLC/TS 50131-7:2008
TitleAlarm systems. Intrusion and hold-up systems. Application guidelines
StatusRevised, Withdrawn
Publication Date30 April 2010
Withdrawn Date31 August 2011
Normative References(Required to achieve compliance to this standard)EN 50131-1:2006, EN 61082-1:2006, IEC 61082-1:2006
Informative References(Provided for Information)EN 60079-0, IEC 60079-0, EN 61082-4, IEC 61082-4
Replaced ByDD CLC/TS 50131-7:2010
ReplacesDD CLC/TS 50131-7:2003
International RelationshipsCLC/TS 50131-7:2008
Draft Superseded ByDD CLC/TS 50131-7:2003
DescriptorsBurglar alarms, Alarm systems, Safety devices, Warning devices, Safety measures, Crime prevention devices, Anti-burglar measures, Design, Installation, Commissioning, Maintenance, Performance, Environmental testing, Grades (quality), Documents
ICS13.310
13.320
Title in FrenchSystèmes d'alarme. Systèmes d'alarme contre l'intrusion et les hold-up. Guide d'application
Title in GermanAlarmanlagen. Einbruch- und Überfallmeldeanlagen. Anwendungsregeln
CommitteeGW/1/2
ISBN978 0 580 63380 5
PublisherBSI
FormatA4
DeliveryNo
Pages58
File Size1.421 MB
Price£260.00


WITHDRAWN TITLE
*To ask about withdrawn titles contact the
Customer Relations
cservices@bsigroup.com, +44 345 086 9001
 Your basket
Your basket is empty

Multi-user access to over 3,500 medical device standards, regulations, expert commentaries and other documents


BSOL

Access, view and download standards with multiple user access, across multiple sites with BSOL


Develop a PAS

Develop a fast-track standardization document in 9-12 months


Worldwide Standards
We can source any standard from anywhere in the world


Customers who bought this product also bought

  • BS EN 50136-1-1:1998+A2:2008
    Alarm systems. Alarm transmission systems and equipment General requirements for alarm transmission systems
  • BS EN 50136-1-5:2008
    Alarm systems. Alarm transmission systems and equipment Requirements for packet switched network PSN
  • BS EN 50131-3:2009
    Alarm systems. Intrusion and hold-up systems Control and indicating equipment
  • BS EN 50136-1-3:1998
    Alarm systems. Alarm transmission systems and equipment Requirements for systems with digital communicators using the public switched telephone network