BS EN 61400-25-5:2007 - Wind turbines. Communications for monitoring and control of wind power plants. Conformance testing – BSI British Standards

Find Similar Items

This product falls into the following categories.

You may find similar items within these categories by selecting from the choices below:

BS EN 61400-25-5:2007

Wind turbines. Communications for monitoring and control of wind power plants. Conformance testing

Status : Current, Work in hand   Published : May 2007

Format
PDF

Format
HARDCOPY



BS EN 61400-25-5 is part of the BS EN 61400-25 series of standards series for vendors (manufacturers, suppliers), operators, owners, planners, and designers of wind power plants as well as system integrators and utility companies operating in the wind energy market. BS EN 61400-25 is intended to be accepted and used world-wide as the international standard for communications in the domain of wind power plants.

The focus of the BS EN 61400-25 series is on the communications between wind power plant components such as wind turbines and actors such as SCADA Systems.

The BS EN 61400-25 series is designed for a communication environment supported by a clientserver model. Three areas are defined, that are modelled separately to ensure the scalability of implementations:

• Wind power plant information models
• Information exchange model
• Mapping of these two models to a standard communication profile.

This part of BS EN 61400-25 specifies standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended.

Internal communication within wind power plant components is outside the scope of the BS EN 61400-25 series.




Standard NumberBS EN 61400-25-5:2007
TitleWind turbines. Communications for monitoring and control of wind power plants. Conformance testing
StatusCurrent, Work in hand
Publication Date31 May 2007
Cross ReferencesIEC 61400-25, IEC 61850-7-1:2003, IEC 61850-7-2:2003, IEC 61850-7-4:2003, ISO/IEC 9646, EN 61400-25, EN 61850-7-1:2003, EN 61850-7-2:2003, EN 61850-7-4:2003, EN ISO/IEC 9646, IEC 61850-2:2003, IEC 61850-4:2002, IEC 61850-5:2003, IEC 61850-6:2004, IEC 61850-7-3:2003, IEC 61850-8-1:2004, EN 61850-8-1:2004, EN 61850-4:2002, EN 61850-5:2003, EN 61850-6:2004, EN 61850-7-3:2003
International RelationshipsEN 61400-25-5:2007,IEC 61400-25-5:2007
Draft Superseded By05/30137813 DC
DescriptorsWind turbines, Turbines, Electric generators, Wind-electric power stations, Data transmission, Data transfer, Information exchange, Control systems, Communication networks, Approval testing, Performance testing
ICS27.180
Title in FrenchEoliennes. Communications pour la surveillance et la commande des centrales éoliennes. Essais de conformité
Title in GermanWindenergieanlagen. Kommunikation für die Überwachung und Steuerung von Windenergieanlagen. Konformitätsprüfungen
CommitteePEL/88
ISBN978 0 580 50675 8
PublisherBSI
FormatA4
DeliveryYes
Pages48
File Size1.041 MB
Price£216.00


 Your basket
Your basket is empty

Take the smart route to manage medical device compliance


BSOL

The faster, easier way to work with standards


BIM Level 2 is here.
We have developed a new website as an official point of reference for using BIM and associated data to increase productivity and reduce waste.


Worldwide Standards
We can source any standard from anywhere in the world


Customers who bought this product also bought

  • BS EN 61400-25-1:2007
    Wind turbines Communications for monitoring and control of wind power plants. Overall description of principles and models
  • BS EN 61400-12-1:2006
    Wind turbines Power performance measurements of electricity producing wind turbines